The heavy-maintenance operation at Manila generates a continuous flow of certified rotables, line spares and certification documentation in both directions. Alongside it, the industrial belt through Laguna and Cavite carries semiconductor assembly and test and general electronics manufacturing.
The city's traffic is the operational reality that has to be planned around rather than hoped past. We build the real road time into the quote and collect earlier than an optimistic plan would.


